ABOUT THE PROJECT
Peninsula Avenue Flood Alleviation
Works Include:
• Excavation and construction of a new soak pit
• Supply and install GPT
• Supply and installation of packaged pump station
• Construction of RRJ rising main
• Installation of new rainvault storage tank
• Installation of new street drainage
• Supply and Installation of Irrigation Pump Station /Truck Filling Station/Bore Pump
Key Aspects:
• Working with Community and local sporting groups
• High groundwater table
• Traffic Control
• Existing Services